Ohio only. We buy, we never sell.

Transformer BuyersOhio

Cash on collection

Sell a 230 kV Transformer in Ohio

Padmount and dry-type units at this voltage bought across Ohio, in service or already on the floor.

Get an Offer(614) 715-3047

Substation-class transformer with radiators and bushings beside switchgear cabinets
A substation-class unit with radiators and bushings on its pad, switchgear alongside.

What we buy

What we buy here

230 kV equipment is common enough that bushings and parts can still be found, which helps a rebuild decision. 230 kV is a distribution class voltage, and units built for it are the most common thing we buy in Ohio.

230 kV class at a glance
Meaning230,000 volts is a bulk transmission level, and the equipment at that voltage is measured in tens of MVA.
Systemsbulk transmission substations
Equipmentpower transformers, GSUs and reactors
Buying noteA 230 kV transformer is a project rather than a purchase, and the oil volume alone needs a containment plan.
Substation-class transformer with radiators and bushings beside switchgear cabinets
A substation-class unit with radiators and bushings on its pad, switchgear alongside.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Voltage class

What 230 kV means on a nameplate

A unit marked 230 kV but built for a different nominal voltage is a unit whose tag needs reading twice. A plant engineer who knows the fault history is worth more than a file of invoices.

A cabinet that has been opened recently has probably been looked at by somebody who knew why. A buying desk earns its keep by answering quickly, because a seller with a unit in the way is not looking for a relationship.

What we see at this voltage

A damaged core changes the arithmetic entirely, and only an inspection will tell you which case you have. A generator step-up unit is designed around one generator, so its impedance is matched rather than generic.

A grounding transformer carries current only during a fault, so its continuous rating tells you very little. A K-rating is the shorthand a data hall needs and a machine shop does not.

Handling and safety

PPE, arc flash boundaries and switching orders are the plant's rules, and the crew reads them before the truck is positioned. Spreader bars keep the slings off the cabinet, and the cabinet is where the damage shows.

A step deck lowers the load and often removes the need for a permit, which is why padmounts travel that way. A lowboy is the answer when the unit is heavy and the approach is long, and the answer is expensive either way.

What it is worth

A failed unit sold as a rebuild candidate is worth more than the same unit sold as scrap, and the difference is the core. A missing bushing subtracts more than its replacement cost, because it signals how the unit was treated.

A seller who understands why an offer is low can often move the offer up without spending much. A price that includes removal is a different number from one that does not, and the difference is the crane.

Common questions

Other voltage classes

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

Do you buy 230 kV transformers in Ohio?

A receiver, a trustee or a plant manager can send a list without it becoming public information. If a unit sits just over a state line, the honest answer is that somebody closer should buy it. A number is only as good as the description behind it, which is why the questions are short and specific.

Service area

What is the difference between 230 kV and the next class up?

If the sale sits inside a confidential process, say so on the first call and the file is handled accordingly. A 230 kV transformer being retired usually comes out of a feeder rebuild or a substation upgrade. A transformer is heavy, oily, regulated and awkward, and every part of the process reflects that.

Payment

Can a 230 kV unit be moved without a permit?

A mixed lot takes longer than a single unit because every tag has to be read, but it still moves in days rather than months. An annual permit covers repetitive moves, and a plant clearing a yard of units can be worked that way. A tank that has been repainted recently deserves a closer look than one that has not.

Ready to move it?