Ohio only. We buy, we never sell.

Transformer BuyersOhio

Any condition, any size

Sell a 75 kVA Transformer in Ohio

Padmount and dry-type units at this rating bought across Ohio, from pole cans to padmounts, with the freight arranged.

Get an Offer(614) 715-3047

Radiator-finned pad-mounted transformer on a skid beside a concrete wall
A radiator-finned padmount on a skid beside a concrete wall.

What we buy

What we buy here

A 75 kVA transformer that has been sitting as a spare is often the best unit left on a site. We weigh when a number sits close to a permit threshold, because guessing on a bridge is not a strategy.

75 kVA working figures
Wet weightabout 750 pounds
Typical usea small office, a restaurant or a light industrial service
Common formthree-phase padmount
Why sellers callSeventy-five kVA three-phase units are common in strip centres and are usually replaced on fit-out rather than on failure.
Radiator-finned pad-mounted transformer on a skid beside a concrete wall
A radiator-finned padmount on a skid beside a concrete wall.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Rating

What a 75 kVA transformer is used for

A 75 kVA unit usually serves a load measured in hundreds of horsepower rather than thousands. A marine unit corrodes at the enclosure long before the winding notices, so the cabinet is the first inspection.

Pole units are the cheapest transformers in any surplus list and the easiest to move, which makes them a good first purchase. A nameplate answers six questions at once, which is why it is the first thing photographed.

Size, weight and handling

Ground bearing is the question a crane operator asks first and the site answers last. A river terminal changes the arithmetic on a very large unit, because barge transport avoids the bridges.

A deduction agreed before the lift is a negotiation, and a deduction after it is an argument. A tornado moves the building rather than the transformer, so access becomes the constraint.

What we check on a 75 kVA unit

We look for evidence of overload, because a unit that ran hot for years shows it in the paint on the tank and the colour of the oil. Nobody has ever regretted testing the oil before agreeing a number, and plenty of people have regretted skipping it.

A sample bottle that has been sitting in a truck since Tuesday is not a sample, it is a guess. Contamination is a legal question before it is an electrical one, and the handling path changes completely.

What it is worth

The gap between scrap value and resale value is the whole reason a buying desk exists. A clean oil test moves a number up faster than a new coat of paint ever will.

An overstock sale is where matching sets appear, and a matching set is worth more than the units bought one at a time. A transformer sold as equipment keeps its documentation chain, and that chain has value to the next owner.

Common questions

Other ratings we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

How much does a 75 kVA transformer weigh?

There is no pressure to accept on the call; the number holds for a set period and you can test it against another buyer. Weight is the first logistics question, and the figure on the tag is not the figure the crane needs, because oil, bushings and skid weight all add up. The order of work is always the same: look, measure, test, agree, lift, pay.

Service area

Do you buy a single 75 kVA unit?

A mixed lot takes longer than a single unit because every tag has to be read, but it still moves in days rather than months. Most units leave within a week of the number being agreed, and a unit that has to clear a site by Friday can usually be gone by Friday. A substation unit is a project rather than a purchase, and it should be planned like one.

Payment

What if the 75 kVA unit has failed?

Sellers who send all four photographs in the first message usually have a number the same morning. A three-phase padmount that failed a high-potential test is a teardown candidate, but the tank and the core often outlive the winding. A site visit answers in twenty minutes what a week of messages cannot.

Ready to move it?