Ohio only. We buy, we never sell.

Transformer BuyersOhio

Paid on pickup

Sell a 300 kVA Transformer in Ohio

Padmount and dry-type units at this rating bought across Ohio, from pole cans to padmounts, with the freight arranged.

Get an Offer(614) 715-3047

Pad-mounted transformer with radiator panels and transmission poles behind
A padmount with radiator panels, transmission poles behind.

What we buy

What we buy here

At 300 kVA, the difference between a single-phase and a three-phase unit is the difference between a can and a cabinet. Rigging weight, shipping weight and operating weight are three different numbers and only one of them belongs on a permit.

300 kVA working figures
Wet weightabout 2,400 pounds
Typical usea small industrial process or a commercial campus building
Common formthree-phase padmount or dry-type
Why sellers callThree hundred kVA units sit in the range where a plant can still handle the move itself and often does not.
Pad-mounted transformer with radiator panels and transmission poles behind
A padmount with radiator panels, transmission poles behind.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Rating

What a 300 kVA transformer is used for

300 kVA is the size that turns up behind a small industrial service, a strip centre, a school or a water plant. A cooling class with dead fans is a smaller transformer wearing a larger nameplate.

The photograph of the nameplate is worth more than a page of description, and it takes about four seconds to take. Phase loss damage is often confined to one winding, which makes the unit a rebuild candidate rather than scrap.

Size, weight and handling

The most common cause of a low offer is a missing nameplate, and the second most common is a missing access route. A gate that is four inches too narrow turns a morning into a week.

A crew that has worked the county before knows which road floods and which bridge is closed for repair. A unit in a yard with a wide gate and a flat approach is worth more than the same unit behind a fence.

What we check on a 300 kVA unit

We grade on the core, the coil, the tank and the bushings rather than on cosmetics, because a faded cabinet with a clean core beats a painted one with a wet tank. A contaminated unit enters a regulated path, and the documentation changes from equipment to waste.

A sample taken from the bottom drain after the unit has stood is worth more than one taken in a hurry. A unit that has been flooded is a teardown inspection rather than a purchase, and the oil analysis is what decides it.

What it is worth

Common questions

Other ratings we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

How much does a 300 kVA transformer weigh?

The process runs on one call and one look: describe the unit, send the tag, agree a number, and put a date on the truck. Overweight is a permit problem before it is a crane problem, and Ohio scales are not forgiving. A seller with a deadline should say so early, because the schedule is built around the date rather than the unit.

Service area

Do you buy a single 300 kVA unit?

Most units leave within a week of the number being agreed, and a unit that has to clear a site by Friday can usually be gone by Friday. We work to your deadline rather than ours, which is why the first question is when the site has to be clear. A seller who sends four photographs at the start usually gets a decision the same day.

Payment

What if the 300 kVA unit has failed?

You will not be handed to a call centre. The person who answers the phone is the person who decides whether we buy. We separate the copper, the core steel, the oil and the hardware, and the arithmetic of a three-phase padmount teardown is not a secret. A buyer who has seen the site will always beat a buyer who has only seen a form, which is why the visit is free.

Let's put a number on it