Ohio only. We buy, we never sell.

Transformer BuyersOhio

No fees, no broker

Sell a 50000 kVA Transformer in Ohio

Padmount and dry-type units at this rating bought across Ohio, from pole cans to padmounts, with the freight arranged.

Get an Offer(614) 715-3047

Substation-class transformer with radiators and bushings beside switchgear cabinets
A substation-class unit with radiators and bushings on its pad, switchgear alongside.

What we buy

What we buy here

A 50000 kVA transformer that has been sitting as a spare is often the best unit left on a site. We weigh when a number sits close to a permit threshold, because guessing on a bridge is not a strategy.

50000 kVA working figures
Wet weightabout 210,000 pounds
Typical usea transmission substation or a generating station
Common formsubstation or GSU
Why sellers callFifty MVA units travel on multi-axle trailers with a route survey and a bridge analysis behind the permit.
Substation-class transformer with radiators and bushings beside switchgear cabinets
A substation-class unit with radiators and bushings on its pad, switchgear alongside.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Rating

What a 50000 kVA transformer is used for

The 50000 kVA class covers padmounts, dry-types and pole units, and the form decides where the unit can go. A transformer energized on a light load first gives the unit a chance to settle and the protection a chance to hold.

A dry-type in a damp room fails from the room rather than from the load. A furnace or kiln unit runs hot for days and then cools, which is harder on insulation than a steady load.

Size, weight and handling

A hilly county makes every lift a rigging problem, and the crane budget grows with the gradient. A municipal weight restriction can stop a move that the state would allow without a second look.

A single-phase padmount is small enough for two people and heavy enough to hurt, so a liftgate is worth arranging. A unit in a fenced compound needs the gate opened by somebody with a key, and that somebody is rarely there at seven.

What we check on a 50000 kVA unit

Dents in a radiator bank matter more than dents in a door, because a crushed fin is a cooling problem that only shows up under load. A test taken before the unit is moved is worth more than one taken after, because the move disturbs the oil.

A single sample is a snapshot and two samples are a trend, and the trend is what a buyer actually wants. A clean test sheet travels with the unit and makes every later conversation shorter.

What it is worth

A cancelled project leaves new equipment in crates with no destination, which is the best condition a buyer will ever see. An expansion is the best kind of sale, because the unit was working when it was disconnected.

Common questions

Other ratings we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

How much does a 50000 kVA transformer weigh?

There is no pressure to accept on the call; the number holds for a set period and you can test it against another buyer. Overweight is a permit problem before it is a crane problem, and Ohio scales are not forgiving. An insurance salvage is bought on the adjuster's valuation rather than the seller's hope, which keeps the process honest.

Service area

Do you buy a single 50000 kVA unit?

The figure we agree is the figure that lands, because rigging and freight are ours to carry, not yours to absorb. If the building changes hands at the end of the month, say so at the start and the schedule gets built backwards from that date. A substation-class unit sits between what a plant can maintain and what a utility would own, which is why it changes hands.

Payment

What if the 50000 kVA unit has failed?

Ohio only is not a limitation for us, it is why the logistics work: the crews, the cranes and the permits are all in-state. A substation that has been sitting with the bushings open is a teardown more often than not, because water gets in and stays. A site visit answers in twenty minutes what a week of messages cannot.

Ready to move it?