Cash on collection
Sell a Wagner Transformer in Ohio
Padmount and dry-type units from this builder bought across Ohio, with the tag read and the serial checked first.

What we buy
What we buy here
Older Wagner substation units often carry a load tap changer, and the tap changer is the part that decides their future. There is no pressure to accept on the call; the number holds for a set period and you can test it against another buyer.
| Common vintages | the 1950s through the 1970s |
|---|---|
| What they built | Wagner built dry-types, oil-filled distribution units and specialty transformers for industry. |
| Where we see them | Ohio plants, utilities and yards |
| Buying note | Wagner units are elderly, and the ones that survive are usually indoors, which is the only reason they are still dry. |

Who we buy from
Six kinds of seller, one desk
- Recyclers
- Electrical contractors
- Equipment dealers
- End users
- Demo contractors
- Distributors
Fast offers
A nameplate photo is usually enough to price a unit the same day.
Dedicated logistics
We arrange the crane, the permits and the flatbed, not you.
No broker fees
You are dealing with the buyer, so nothing is shaved off the offer.
How it works
Six steps from your yard to the money
- 01
Take pictures
The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.
- 02
Send them to us
The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.
- 03
Review the offer
A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.
- 04
We schedule freight
Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.
- 05
Testing on arrival
Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.
- 06
Get paid
Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.
What we handle for you
The parts sellers dread, done for you
Rigging
Crane and forklift arranged around your access, not the other way round.
Oil containment
Bunds, absorbent and disposal handled before the unit moves.
Bill of sale
A clean title document for your records, signed on collection.
PCB paperwork
Pre-1979 units get the testing and the manifest they need.
Brand
Wagner transformers in Ohio
Wagner built transformers for decades, and the units that survive in Ohio carry the design habits of their era. A unit in a building that is coming down is a different problem from a unit in a plant that is staying.
A site inside a city limit usually means an overnight move and a closed lane. A partial assembly is bought on the assumption that something is missing, because it usually is.
What we look for on a Wagner unit
A site that has been photographed properly can be quoted without a visit, and the visit is only a confirmation. A short conversation at the start saves an argument at the gate, and the argument is the expensive part.
A seller should ask what happens to the unit after it leaves, because the answer says what kind of buyer they are dealing with. The work is unglamorous and the equipment is heavy, which is why so few people do it properly.
Where the value sits
The common Wagner padmounts are the ones that show up in subdivisions and industrial parks, and they are the easiest to move. A seller comparing two offers should compare the assumptions behind them rather than the headline figure.
A sealed unit that has lost its gas blanket has lost the advantage that justified the price. A price that includes removal is a different number from one that does not, and the difference is the crane.
Paperwork, insurance and the crew
A cyclic load leaves a different signature in the oil than a steady one, and the lab report shows it. The bill of sale fixes the moment risk moves, and that moment should be the moment the unit leaves the pad.
Common questions
Other brands we buy
Get started
Get an offer in minutes
Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.
(614) 715-3047or send the form and we will call you.
Questions
What sellers ask before they call
Equipment types
Do you buy older Wagner transformers?
A buyer who says yes to everything is not a buyer; the useful answer explains what would have to be true for the number to rise. Where a Wagner unit has a known failure mode we say so before quoting, because it changes what the unit is worth. A cabinet that has been opened recently has probably been looked at by somebody who knew why.
Service area
What if the Wagner nameplate is missing?
Site names, addresses and photographs stay in the file, and the file does not leave the desk. The weight on the tag is a starting point rather than a permit application, because oil weight and rigging weight are separate figures. The market for used transformers is smaller than the market for new ones, and it rewards honest descriptions.
Payment
Can you pick up a Wagner unit this week?
The first pass costs nothing and takes ten minutes, because no site visit is needed to reach a working number, only to confirm it. Nothing sits in our queue for a week waiting for approval, because the buyer who quotes you also books the crew. A desk that buys for its own account answers with a figure rather than a promise to find one.