Ohio only. We buy, we never sell.

Transformer BuyersOhio

Cash on collection

Sell a GE Prolec Transformer in Ohio

Padmount and dry-type units from this builder bought across Ohio, with the tag read and the serial checked first.

Get an Offer(614) 715-3047

A long row of finned pad-mounted transformers in an open yard
A long yard row of finned padmounts under an overcast sky.

What we buy

What we buy here

GE Prolec serial numbers date a unit precisely, which is useful when the nameplate has been painted over. If a unit is scrap, we will tell you it is scrap instead of dressing it up as something better.

GE Prolec at a glance
Common vintagesthe 2000s and 2010s
What they builtProlec GE built padmounts, pole types and three-phase distribution units in volume for utility stock.
Where we see themOhio plants, utilities and yards
Buying noteProlec padmounts are recent enough that most still have clean oil, and they are the easiest units to resell into a utility programme.
A long row of finned pad-mounted transformers in an open yard
A long yard row of finned padmounts under an overcast sky.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Brand

GE Prolec transformers in Ohio

Some GE Prolec units are easier to rebuild than others, and that shows up in what we can offer for one. A township site is usually simpler than a city site, because there is no lane closure to arrange.

A unit that has been disconnected for a year is not the same proposition as one that came out last week. A buyer who works the whole state can move a unit to whichever plant needs it, which is why the coverage matters.

What we look for on a GE Prolec unit

A seller who knows what the unit is saves everybody an hour, and the hour is often the difference. Nothing about a transformer improves by waiting, and the oil in particular gets worse rather than better.

A site manager who has already cleared the pad has done most of the work that matters. The market for used transformers is smaller than the market for new ones, and it rewards honest descriptions.

Where the value sits

A GE Prolec unit with its original bushings is a better candidate than one that has been re-bushed with mismatched parts. A common rating at a common voltage is worth more than a rare one in perfect order, which surprises sellers every week.

A buyer prices the whole unit, including the parts that will be scrapped, and the offer reflects the mix. A number that survives the site visit is worth more than one that was generous on the phone.

Paperwork, insurance and the crew

A repaired unit with documentation is a known quantity and often better than an original of the same age. A signature from somebody without authority is the most common problem in a salvage file.

Common questions

Other brands we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

Do you buy older GE Prolec transformers?

Discretion costs nothing here, and it is the reason a good share of our work arrives by referral inside the same plant. When the answer is no, it is usually about the core, the oil or the access, and we name which one. The second data plate on a rebuilt unit matters more than the first, and it is easy to photograph by mistake.

Service area

What if the GE Prolec nameplate is missing?

We turn down units that cannot be moved safely, and we say so before anybody spends money on a crane. Impedance is the figure most sellers ignore and most buyers ask for second, because it decides how the unit behaves on a fault. The unit is the easy part; the site, the access and the paperwork are where the time goes.

Payment

Can you pick up a GE Prolec unit this week?

A broker has to shop a unit before committing to it; we own the decision, so the number you hear is a number that holds. We work to your deadline rather than ours, which is why the first question is when the site has to be clear. The unit will outlast the building it serves, which is why so many of them change hands.

Ready to move it?