Ohio only. We buy, we never sell.

Transformer BuyersOhio

Cash on collection

Sell a Sealed Dry-Type Transformer in Ohio

Dry-type units of this type bought across Ohio, in any condition, with the oil sampled before we quote.

Get an Offer(614) 715-3047

Pad-mounted transformer stored inside a steel-framed building
A padmount stored indoors under a steel roof. No dry-type unit in this library yet; this is the indoor bay.

What we buy

What we buy here

A sealed dry-type transformer is usually the last piece of equipment replaced in a plant upgrade, because it is the heaviest and the most disruptive. We buy sealed dry-type transformers in any condition that can be moved, from a running unit to one that failed a test last month.

Working figures
Size band300 kVA to 5 MVA
Voltage4,160 to 34,500 volts
Usually foundchemical plants, refineries and locations where oil is unwelcome
What we inspecttank pressure, seal condition and the gas blanket record
How it travelsa crane and a flatbed, because the sealed tank is heavy
Pad-mounted transformer stored inside a steel-framed building
A padmount stored indoors under a steel roof. No dry-type unit in this library yet; this is the indoor bay.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Transformer type

What a sealed dry-type transformer is

What separates a sealed dry-type transformer from the next family is usually the enclosure, the cooling and the way the winding is insulated. A temperature rise of 55 degrees is a more conservative build than 65, and the difference shows in the weight.

A mechanical room built around a transformer will have to be opened, and the wall usually goes back afterwards. A phase shifter without its control system is a very expensive fixed reactor.

Where these units turn up in Ohio

The unit is the easy part; the site, the access and the paperwork are where the time goes. A short drive within one county costs less than a long drive across three, and the number shows it.

A unit with elevated gas that has been stable for a decade is a different proposition from one where the figure doubled. A buyer who has seen the site will always beat a buyer who has only seen a form, which is why the visit is free.

What we check before we quote

The cabinet tells you whether anybody has been inside it recently, and the bolt heads tell you whether they knew what they were doing. A unit that has been flooded is a teardown inspection rather than a purchase, and the oil analysis is what decides it.

A sample taken from the bottom drain after the unit has stood is worth more than one taken in a hurry. A unit stored on gravel wicks moisture from below, and a unit on timber skids takes it from the air.

Condition, oil and contamination

What a sealed dry-type transformer is worth to us

Getting it off the pad

Common questions

Other transformer types we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

Do you buy a sealed dry-type transformer that has already failed?

A receiver, a trustee or a plant manager can send a list without it becoming public information. We tell a seller when a sealed dry-type transformer is a teardown, because pretending otherwise wastes everybody's week. A transformer that has been idle for two years may still be perfect, and the test sheet is how you find out.

Service area

What does a sealed dry-type transformer weigh, and does that change the pickup?

If the building changes hands at the end of the month, say so at the start and the schedule gets built backwards from that date. If the weight is unknown, the tank dimensions and the radiator count get a buyer within a few percent. A seller with four units on one site gets a better number per unit than a seller with one.

Payment

Can you collect a sealed dry-type transformer outside Ohio?

The only thing that changes a quote afterwards is something the photographs did not show, which is why we ask early. Every county in the state is covered, from the lake shore to the river, and Ohio sits inside the regular loop. A plant engineer who knows the fault history is worth more than a file of invoices.

The unit has a buyer