Ohio only. We buy, we never sell.

Transformer BuyersOhio

Any condition, any size

Sell a Phase Shifting Transformer in Ohio

Padmount and dry-type units of this type bought across Ohio, in any condition, with the oil sampled before we quote.

Get an Offer(614) 715-3047

Substation-class transformer with radiators and bushings beside switchgear cabinets
A substation-class unit with radiators and bushings on its pad, switchgear alongside.

What we buy

What we buy here

The load behind a phase shifting transformer is what wears it out, and a lightly loaded unit lasts far longer than its year suggests. We buy single phase shifting transformers and we buy lots, and a lot is judged unit by unit rather than by the pound.

Working figures
Size band50 to 500 MVA
Voltage138,000 to 345,000 volts
Usually foundtransmission substations and tie points between systems
What we inspectthe tap changer mechanism, impedance and the control scheme
How it travelsa heavy haul planned with the utility, since the unit usually sits inside an energized yard
Substation-class transformer with radiators and bushings beside switchgear cabinets
A substation-class unit with radiators and bushings on its pad, switchgear alongside.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Transformer type

What a phase shifting transformer is

The phase shifting transformer form factor decides how it is installed, and installation decides how it comes out. A tape measure across the tank and a count of the radiators will size most units whose tag has gone.

Impedance is the figure that decides whether the existing protection still works, and it is printed on the tag. A bushing with a cracked porcelain skirt fails a visual inspection before it fails electrically.

Where these units turn up in Ohio

A unit in a building that is coming down is a different problem from a unit in a plant that is staying. A decommissioning is orderly, which makes it the easiest kind of large project to buy from.

A flat county with wide roads makes a heavy move routine, and the number reflects it. A short list of photographs covers the cabinet, the tag, the bushings and the access, and nothing else is needed at the start.

What we check before we quote

Dents in a radiator bank matter more than dents in a door, because a crushed fin is a cooling problem that only shows up under load. A sample bottle that has been sitting in a truck since Tuesday is not a sample, it is a guess.

A seller who keeps the test sheet makes the next sale faster, because the next buyer asks the same questions. A sample taken from the bottom drain after the unit has stood is worth more than one taken in a hurry.

Condition, oil and contamination

What a phase shifting transformer is worth to us

Getting it off the pad

Common questions

Other transformer types we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

Do you buy a phase shifting transformer that has already failed?

A mixed lot takes longer than a single unit because every tag has to be read, but it still moves in days rather than months. We tell a seller when a phase shifting transformer is a teardown, because pretending otherwise wastes everybody's week. The paperwork at the end is short, and it is the part that keeps everybody out of trouble.

Service area

What does a phase shifting transformer weigh, and does that change the pickup?

A buyer reads the tag, checks whatever oil history exists, and says what the unit is worth as it stands rather than what it might be worth rebuilt. The truck is chosen from the weight, the height and the axle count, not from whatever happens to be in the yard. A unit that has been in service is a known quantity, and a unit that has been idle is a question.

Payment

Can you collect a phase shifting transformer outside Ohio?

Every county in the state is covered, from the lake shore to the river, and Ohio sits inside the regular loop. If a unit sits just over a state line, the honest answer is that somebody closer should buy it. An insurance salvage is bought on the adjuster's valuation rather than the seller's hope, which keeps the process honest.

Ready to move it?