Ohio only. We buy, we never sell.

Transformer BuyersOhio

No fees, no broker

Sell a Drive Isolation Transformer in Ohio

Padmount and dry-type units of this type bought across Ohio, in any condition, with the oil sampled before we quote.

Get an Offer(614) 715-3047

Pad-mounted transformer stored inside a steel-framed building
A padmount stored indoors under a steel roof. No dry-type unit in this library yet; this is the indoor bay.

What we buy

What we buy here

drive isolation transformers are often the oldest asset on a site and the least documented, which is why the tag photograph matters. The one thing that stops a drive isolation transformer purchase is a unit that cannot be identified at all.

Working figures
Size band5 to 1,000 kVA
Voltage208 to 600 volts
Usually foundpump stations, HVAC plants, conveyors and process lines with drives
What we inspectwinding insulation class, shield bonding, harmonic heating and enclosure ventilation
How it travelsa pallet and a forklift, with the shield ground left intact
Pad-mounted transformer stored inside a steel-framed building
A padmount stored indoors under a steel roof. No dry-type unit in this library yet; this is the indoor bay.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Transformer type

What a drive isolation transformer is

Most drive isolation transformers are bought for a project that never happened, which is why so many of them are in good condition. A replacement unit with different impedance can turn adequate switchgear into inadequate switchgear.

Harmonics put current on the neutral and heat in the core, and a standard unit dislikes both. A dry-type in a damp room fails from the room rather than from the load.

Where these units turn up in Ohio

The unit is the easy part; the site, the access and the paperwork are where the time goes. A hilly county makes every lift a rigging problem, and the crane budget grows with the gradient.

A town that lost its main plant still has the substation that fed it, and that substation is where the surplus is. Every county in Ohio has a slightly different way of doing things, and a buyer who works statewide learns them all.

What we check before we quote

The pad tells a story too: a settled pad, a rust line at the base and a tilted cabinet all point at water where water should not be. A sample taken from the bottom drain after the unit has stood is worth more than one taken in a hurry.

A bushing, a gasket and an oil processing are the three cheapest ways to raise a number. A three-winding unit needs a test sheet rather than a description, because the tertiary changes everything.

Condition, oil and contamination

What a drive isolation transformer is worth to us

Getting it off the pad

Common questions

Other transformer types we buy

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

Do you buy a drive isolation transformer that has already failed?

Sellers who send all four photographs in the first message usually have a number the same morning. A drive isolation transformer that failed a high-potential test is a teardown candidate, but the tank and the core often outlive the winding. Paint is a cosmetic question, and seam rust is a structural one, and the two are often confused.

Service area

What does a drive isolation transformer weigh, and does that change the pickup?

We send remittance the same day and we match the seller's invoicing requirements, whether that is a purchase order or a signed bill of sale. Rigging weight, shipping weight and operating weight are three different numbers and only one of them belongs on a permit. A unit that is documented is easier to move than one that is not, in every sense of the word.

Payment

Can you collect a drive isolation transformer outside Ohio?

A mixed lot takes longer than a single unit because every tag has to be read, but it still moves in days rather than months. Every county in the state is covered, from the lake shore to the river, and Ohio sits inside the regular loop. A substation-class unit sits between what a plant can maintain and what a utility would own, which is why it changes hands.

Let's put a number on it