Ohio only. We buy, we never sell.

Transformer BuyersOhio

Paid on pickup

Temperature Rise: 55/65 and What It Costs You

A working guide for Ohio sellers: what decides the number and how the unit leaves.

Get an Offer(614) 715-3047

Transformer in lifting slings being lowered onto a trailer
A unit in the slings, lifted over the deck of a trailer.

What we buy

What we buy here

Most of what matters about Temperature Rise: 55/65 and What It Costs You can be settled before anybody picks up a wrench. A relocation leaves behind exactly the units that were built into the building, which is why they become surplus. A tank that has been repainted recently deserves a closer look than one that has not.

The last step is the one people rush, so confirm the unit is de-energised, isolated and grounded before anyone opens a door. A unit that has been disconnected for a year is not the same proposition as one that came out last week. A seller should never feel rushed into a decision, and a buyer should never need to rush one.

Transformer in lifting slings being lowered onto a trailer
A unit in the slings, lifted over the deck of a trailer.

Who we buy from

Six kinds of seller, one desk

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors

Fast offers

A nameplate photo is usually enough to price a unit the same day.

Dedicated logistics

We arrange the crane, the permits and the flatbed, not you.

No broker fees

You are dealing with the buyer, so nothing is shaved off the offer.

How it works

Six steps from your yard to the money

  1. 01

    Take pictures

    The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.

  2. 02

    Send them to us

    The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.

  3. 03

    Review the offer

    A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.

  4. 04

    We schedule freight

    Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.

  5. 05

    Testing on arrival

    Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.

  6. 06

    Get paid

    Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.

What we handle for you

The parts sellers dread, done for you

Rigging

Crane and forklift arranged around your access, not the other way round.

Oil containment

Bunds, absorbent and disposal handled before the unit moves.

Bill of sale

A clean title document for your records, signed on collection.

PCB paperwork

Pre-1979 units get the testing and the manifest they need.

Guide

What the numbers mean

A 55/65 rise rating means the winding averages 55 degrees above ambient at rated load, and can reach 65 with a loss of life. A 55-degree rise unit is more conservatively built than a 65-degree unit of the same kVA, and it usually weighs more. Ambient in an Ohio mechanical room can run well above the design figure, which quietly derates everything in it.

A buyer's first question is about the rating and the second is about the access, in that order. A desk that buys for its own account answers with a figure rather than a promise to find one.

The life equation

Insulation life halves for roughly every eight degrees of sustained extra heat, which is why the difference between 55 and 65 matters. A unit that has run at its 65-degree limit for twenty years has used more life than a 55-degree unit of the same age. An oil test cannot measure insulation life directly, but hot oil usually shows it in acidity and colour.

A buyer who arrives unprepared wastes the site's morning, which is remembered long after the unit is gone. A purchase is a handover of risk as much as a handover of metal.

At purchase

A 55-rise unit is worth more in a hot location because it has margin the other unit does not. A 65-rise unit is fine for a standby duty where it runs rarely. The figure is on the nameplate, so there is no reason to guess.

The practical rule

Checklist for temperature rise: 55/65 and what it costs you

Questions about temperature rise: 55/65 and what it costs you

Related guides

Get started

Get an offer in minutes

Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.

(614) 715-3047or send the form and we will call you.

Questions

What sellers ask before they call

Equipment types

Does temperature rise: 55/65 and what it costs you change what a transformer is worth?

A 55-rise unit is worth more in a hot location because it has margin the other unit does not. The figure is on the nameplate, so there is no reason to guess.

Service area

Where does a seller start with temperature rise: 55/65 and what it costs you?

A 55-degree rise unit is more conservatively built than a 65-degree unit of the same kVA, and it usually weighs more. A buyer who explains the reasoning gets a second call, and the second call is where the good units are.

Payment

Is temperature rise: 55/65 and what it costs you part of what a buyer checks on site?

If the room is hot and the load is continuous, buy the lower rise or buy a bigger unit. If the room is hot and the load is continuous, buy the lower rise or buy a bigger unit.

A buyer, not a broker