No fees, no broker
Net Metering in Ohio: The Rules That Affect Transformer Sizing
A working guide for Ohio sellers: what decides the number and how the unit leaves.

What we buy
What we buy here
Understanding Net Metering in Ohio: The Rules That Affect Transformer Sizing changes the conversation from what a unit weighs to what a unit is. A unit that is documented is easier to move than one that is not, in every sense of the word. A unit that was replaced during an upgrade is almost always a better buy than one that failed on a Tuesday.
Work from the outside in and write down what you see, because a written record is worth more than a memory. A desk that buys for its own account answers with a figure rather than a promise to find one. A plant engineer who knows the fault history is worth more than a file of invoices.

Who we buy from
Six kinds of seller, one desk
- Recyclers
- Electrical contractors
- Equipment dealers
- End users
- Demo contractors
- Distributors
Fast offers
A nameplate photo is usually enough to price a unit the same day.
Dedicated logistics
We arrange the crane, the permits and the flatbed, not you.
No broker fees
You are dealing with the buyer, so nothing is shaved off the offer.
How it works
Six steps from your yard to the money
- 01
Take pictures
The nameplate, the cabinet interior and the tank in daylight. Three photographs are usually enough to place a unit in the right class and the right price band.
- 02
Send them to us
The form on this page, a text or an email all reach the same desk. Include the city, the access and any deadline the site is working to.
- 03
Review the offer
A buyer reads the photographs, asks one or two questions and sends a written offer with the assumptions stated, so nothing changes on the day.
- 04
We schedule freight
Crane, flatbed and permits are booked around your access. You get a date and a window, and we carry the cost of getting it right.
- 05
Testing on arrival
Winding resistance, megger and turns ratio, plus oil analysis where the unit is liquid filled. The results decide the final number, and you see them.
- 06
Get paid
Payment is released on the agreed terms once the unit is received and tested, by check or ACH. No retention, no sixty-day terms.
What we handle for you
The parts sellers dread, done for you
Rigging
Crane and forklift arranged around your access, not the other way round.
Oil containment
Bunds, absorbent and disposal handled before the unit moves.
Bill of sale
A clean title document for your records, signed on collection.
PCB paperwork
Pre-1979 units get the testing and the manifest they need.
Guide
The framework
Ohio's net metering rules allow a customer-generator to offset consumption with on-site generation, subject to size limits and the utility's tariff. The rules have been revised more than once, so the current tariff matters more than the older summaries. A project above the threshold is treated as a generation facility rather than a net-metered customer.
A unit that came out of a working plant is almost always the better buy, and sellers rarely realise it. A unit with elevated gas that has been stable for a decade is a different proposition from one where the figure doubled.
What it does to the transformer
Reverse power flow means the transformer has to carry power in both directions, which is normal but changes the protection assumptions. A transformer sized only for load may be undersized for export, which affects voltage rise on the feeder. The utility may require a specific impedance or a specific tap setting to keep voltage within limits.
A unit substation is convenient in service and awkward to move, because the sections are bolted together. A transformer that has been idle for two years may still be perfect, and the test sheet is how you find out.
At the equipment level
A used transformer is acceptable if its rating and impedance match the study assumptions. A unit with a different impedance can change the voltage regulation enough to fail the study.
The practical order
Checklist for net metering in ohio: the rules that affect transformer sizing
Questions about net metering in ohio: the rules that affect transformer sizing
Related guides
Get started
Get an offer in minutes
Five fields and a phone number is all we need to start. We reply the same business day, and a firm number follows the nameplate photo.
(614) 715-3047or send the form and we will call you.
Questions
What sellers ask before they call
Equipment types
Does net metering in ohio: the rules that affect transformer sizing change what a transformer is worth?
A used transformer is acceptable if its rating and impedance match the study assumptions. A unit with a different impedance can change the voltage regulation enough to fail the study.
Service area
Where does a seller start with net metering in ohio: the rules that affect transformer sizing?
The rules have been revised more than once, so the current tariff matters more than the older summaries. A transformer that is still bolted down belongs to the building until somebody unbolts it, and that is a decision.
Payment
Is net metering in ohio: the rules that affect transformer sizing part of what a buyer checks on site?
Confirm the current tariff with the utility before sizing anything, because the rules have changed and will change again. Confirm the current tariff with the utility before sizing anything, because the rules have changed and will change again.
More